GUYANA GAS TO ENERGY PROJECT

GUYANA GAS TO ENERGY PROJECT
GUYANA GAS TO ENERGY PROJECT
_("Mappa

Project information

The scope of work includes the following: 

  • Installation of the Onshore Pipeline from the offshore Battery Limit to the Receiving Facility at the Integrated Plant. Approximate 25 km Dn 12”

Main Interferences include: 

Ten (10) HDD´s for a total approximate length of 5.054 m and two (02) Bored crossings for a total approximate length of 120 m 

 

  • Construction, installation, and testing of the Shore Crossing Valve Site and the Receiving Facility including all civil, piping and instrumentation, fencing, lighting, and CCTV.

CLIENT

EXXON (Guyana)

LOCATION

Georgetown, Guyana

DN

12”

LENGTH

25 Km

START OF WORK

2023

END OF WORK

2024