WORLDWIDE EPC SOLUTIONS FOR THE ENERGY INDUSTRY SINCE 1962

WARDENBURG-DROHNE PIPELINE (WAD) – LOT 2

WARDENBURG-DROHNE PIPELINE (WAD) – LOT 2
WARDENBURG-DROHNE PIPELINE (WAD) – LOT 2
_("Mappa

Project information

The project, located 60 Km SW of Bremen, entails the execution of LOT 2 of the Wardenburg-Drohne Pipeline.

The 40” pipeline stretches 30 Km and crosses the typical wet areas of North-Western Germany. Dewatering and sheet piling represent the main challenges. This infrastructure, when completed, will provide the capacities needed to move regasified LNG landed at the Wilhelmshaven terminal into the German pipeline transmission system.

All pipes are certified for the transportation of hydrogen.


CLIENT

Open Grid Europe GmbH (OGE)

LOCATION

Lower Saxony, Germany

DN

40”

LENGTH

30 Km

START OF WORK

2025

END OF WORK

2026

See all news and project updates

SICIM is back in Germany

SICIM is back in Germany

With Open Grid Europe, our contribution to Europe’s long-term shift toward low-emission energy infrastructure.

Read all