Project information
The scope of work includes the EPC of the following:
KEP 1A Scope:
1- Compressor Island A (capacity of 12.3 MSCMD)
2- Main Interconnecting & Flare Pipe Racks
3- Inlet Facilities at KPC (slug catcher area)
4- Brownfield modifications (optional scope)
5- Injection approach facilities
6- Utilities & Flare System
7- HP Flare & Flare Interconnecting Piperack System
8- Temporary Contractor Facilities
9- Remote Manifold Station 1
10- KEP1A Production Trunklines & Test Lines: 2x18” production trunk lines and 1x16” test line, 3.8 KM respectively.
11- KEP1A Re-Injection Trunkline (KPC 1st Trunkline): 1x12” re-injection trunkline approximately 5 Km long.