MASTER GAS SYSTEM EXPANSION PHASE III

MASTER GAS SYSTEM EXPANSION PHASE III
_("Mappa

Project information

The Master Gas System is one of the world's largest hydrocarbon networks to transport gas to support industrialization.

The Phase 3 project aims to convert a number of power plants from oil to natural gas, contributing a cleaner energy mix and its net-zero emission goal.

More specifically, package 10 requires a 56-inch pipeline to be laid from sector one STS-2 to sector two STS-1, over a total of 310 km, while package 14 requires a total of 212 km of 56-inch, 10-inch and 18-inch diameters to be laid in the Shoaiba area. The following will be installed on the pipelines: 18 mainline valves (safety valves to control the flow of gas), 12 launching and receiving stations (for cleaning and maintenance), and 26 burn pits (for disposal). A key part in each package is played by civil, mechanical and electrical instrumentation engineering.


CLIENT

SAUDI ARAMCO

LOCATION

Kingdom of Saudi Arabia

DN

56” / 18” / 10”

LENGTH

522 Km

START OF WORK

2024

END OF WORK

2028

See all news and project updates

SICIM and the “Master Gas System Expansion” project in Saudi Arabia

SICIM and the “Master Gas System Expansion” project in Saudi Arabia

SICIM has been selected for a significant part of the Saudi Aramco “Master Gas System Expansion Phase 3” (MGS III) project in Saudi Arabia