SICIM si è aggiudicata una significativa parte dei lavori per il progetto “Master Gas System Expansion Phase 3” (MGS III) di Saudi Aramco in Arabia Saudita
Leggi tutto
Informazioni sul progetto
The Master Gas System is one of the world's largest hydrocarbon networks to transport gas to support industrialization.
The Phase 3 project aims to convert a number of power plants from oil to natural gas, contributing a cleaner energy mix and its net-zero emission goal.
More specifically, package 10 requires a 56-inch pipeline to be laid from sector one STS-2 to sector two STS-1, over a total of 310 km, while package 14 requires a total of 212 km of 56-inch, 10-inch and 18-inch diameters to be laid in the Shoaiba area. The following will be installed on the pipelines: 18 mainline valves (safety valves to control the flow of gas), 12 launching and receiving stations (for cleaning and maintenance), and 26 burn pits (for disposal). A key part in each package is played by civil, mechanical and electrical instrumentation engineering.