WORLDWIDE EPC SOLUTIONS FOR THE ENERGY INDUSTRY SINCE 1962

Completed projects

The most important projects of the last 10 years
PROJECT LENGTH DN" START END
TIGF (France)
EPC of the Artère du Bearn Project, Pipeline from Lacq to Lussagnet
57 Km 32“ 2011 2012
ENAGAS (Spain)
Gasoducto Tivissa – Paterna Tr3 (Sud)
64,6 Km 40“ / 32“ 2011 2012
BATEMAN (Kazakhstan)
Kashagan Field Development Experimental Program. Power Generation & Utility Plant. Mechanical Works
2008 2012
CH2M HILL (Mexico)
Front End Engineering Design (FEED) Frontera – Aguascalientes Natural Gas Transportation System
954 Km 30“ / 36“ 2011 2012
WINGAS (Germany)
OPAL Project, pipeline construction from Lubmin to Olbernhau
136,5 Km 56“ 2009 2011
ENI CONGO (Congo)
EPC of the Pipeline for the Development of Zingali Oil Field and related wells connections, electrical and instrumentation activities on Zingali platform
6 Km 6“ 2010 2011
AGIP KCO (Kazakhstan)
Kashagan Experimental Programme Project. Construction of the Underground Piping System in the Gas, Sulphur and Slug Catcher Areas of the Main Plant.
PLANT WORKS 2007 2011
ENI CONGO (Congo)
Procurement, Construction and Installation Activities with optional Engineering within M’Boundi Oil Centre related to the phase 1 of Gas Valorisation Project & EPC for the New Gas Gathering Network and its connections at the 10" pipeline related to phase 2
PLANT & PIPELINE WORKS 8“ / 10“ 2009 2011
ENI CONGO (Congo)
Engineering, Procurement and Construction (EPC) to link water wells and water treatment section in M'Boundi
2009 2011
TRANSCANADA (Mexico)
Manzanillo - Guadalajara Gas Pipeline
306 Km 30“ / 24“ 2010 2011