Mexico Pacific, GDI Sicim Pipelines and Bonatti have signed an EPC contract for the “Sierra Madre” project
Read all
Project information
The battery limits of the Pipeline extend from the interconnection point at the US/Mexico border in
the state of Chihuahua (km 00+000) to the Measurement, Regulation and Control Station (MRCS)
at the Terminal in Puerto Libertad in the state of Sonora, Mexico (approximately km 800+000)


