WORLDWIDE EPC SOLUTIONS FOR THE ENERGY INDUSTRY SINCE 1962

SIERRA MADRE PIPELINE

SIERRA MADRE PIPELINE
SIERRA MADRE PIPELINE
_("Mappa

Project information

The battery limits of the Pipeline extend from the interconnection point at the US/Mexico border in 
the state of Chihuahua (km 00+000) to the Measurement, Regulation and Control Station (MRCS) 
at the Terminal in Puerto Libertad in the state of Sonora, Mexico (approximately km 800+000)


CLIENT

Trasportadora de Gas Sierra madre de R.L de C.V. (Mexico)

LOCATION

Chihuahua/Sonora, Mexico

DN

48”

LENGTH

800 Km

START OF WORK

2024

END OF WORK

2026