
Project information
Execution of planned turnarounds and shut down activities;
SoW includes following works:
• Installation, alignment and demolition of Mechanical Equipment
• Fabrication, installation, testing, flushing and demolition of Piping
• Supply and installation of required pipe supports
• Tie-ins to existing piping systems
• In-Line and On-Line Instrument installation
• Pickling and passivation of SS piping
• Coordination of all NDT work
• Testing and Pre-commissioning
• Start-up assistance