PRIORITY 4 (P4) PIPELINES

PRIORITY 4 (P4) PIPELINES
PRIORITY 4 (P4) PIPELINES
_("Mappa

Project information

Diameter        Thickness        Total Length

24’’                  9.8 mm                  35.6 km

20’’                  9.5 mm                  15.3 km

18’’                  7.92 mm                1.1 km

18’’                  7.2 mm                   1 km

10’’                  11.3 mm                 0.7 km

12’’                  12.7 mm                 0.8 km

6’’                     7.2 mm                   1.1 km


CLIENT

TENGIZCHEVROIL (Kazakhstan)

LOCATION

Tengiz, Kazakshtan

LENGTH

56 Km

DN

6” / 10” / 12” / 18” / 20” / 24”

START OF WORK

2020

END OF WORK

2022