472 km pipeline to connect Tratayén to the Gulf of San Matías and support gas exports
Read all
Project information
EPC services for a 36”, 472 km-long pipeline and related facilities.
The project involves the construction of a gas pipeline to transport production from the Vaca Muerta field to the Gulf of San Matías.
The Project was divided into three separate Lots:
Lot 1
- 186.8 km 36” Pipeline
- n.6 BVS 36”
- n.3 Receiving/Launching Trap stations
Lot 2
- 200.74 km 36” Pipeline
- n.6 BVS 36”
- n. 2 Receiving/Launching Trap stations
- Río Negro Crossing (HDD)
Lot 3
- 84.3 km 36” pipeline
- n.3 BVS 36”
- n.1 Terminal receiving trap
- n.1 Fiscal Metering Station FMS
The project includes also the line pipes transportation from an area adjacent to the Port of San Antonio Oeste to the ROW.