Project information
The Multiphase Trunklines interconnect the oil manifolds headers of nearest DGS’s. The connection to the existing is realized with new tie-ins at the headers of the oil manifolds.
The new dedicated sending/receiving stations are designed for the utilization of movable pig traps. Support for the Altamira microtunnel, the “Altamira Landfall. Microtunnel length 2,305 m. The DGS interested by the works are:
- Hammar Mishrif New DGS (DGS North): Execution of 26” Trunkline from Hammar Mishrif New DGS (DGS N), to/from Hammar existing DGS; Execution of Trap Area works, line connections and tie ins Hammar Mishrif New DGS (DGS N).
- Hammar existing DGS (DGS N), Execution of 20” Trunkline from Hammar existing DGS, to/from Zubair Mishrif existing DGS; Execution of Trap Area works, line connections and tie ins inside Hammar existing DGS (interconnection of the 3 new Trunklines: TK-01,TK-02 & TK-04).
- Zubair Mishrif existing DGS TK3 - Execution of 26” Trunkline from Zubair existing DGS, to/from, Zubair Mishrif existing DGS with material supplied by COMPANY.
- Zubair existing DGS TK3 - Execution of Trap Area works, line connections and tie ins inside Zubair existing DGS, with materials supplied by COMPANY. TK4 - Execution of 20” Trunkline from Zubair Mishrif existing DGS, to/from, Hammar Existing DGS with material supplied by
CLIENT
ENI IRAQ (Iraq)
LOCATION
Zubair Field, Iraq
DN
20“ / 26“
LENGTH
35,65 Km
START OF WORK
2017
END OF WORK
2019