Project information
Project Management, Detail Design and Engineering, Procurement, Inspection and Testing, Supply and
Transportation, Construction, Precommissioning, Commissioning and provision of assistance to COMPANY during
Start-Up and Performance Tests of the following facilities:
a) Extension of high pressure (HP) and medium pressure (MP) produced water headers to transfer the
produced water to the new Produced Water Treatment (PWT) Unit;
b) New PWT unit composed by produced water storage and treatment systems;
c) New Water Injection (WI) system consisting of:
- Low pressure (LP) Water distribution unit at Central Process Facility (CPF) by means of new
Treated Water (TW) tank and new LP pumps,
- New LP Water distribution pipeline to transfer the TW to the remote Well Pads (Well Pad #07 and
Well Pad #11/1A),
- High Pressure injection system at Well Pad #07 and Well Pad #11/1A by means of new HP Water
Injection pumps and relevant HP injection manifolds and injection well hook-ups.
d) Vent Gas Compressor Unit (VGCU), a new H2S disposal system at CPF consisting of a network for the
collection of vent gas from new Produced and Treated water systems sources, a boosting station equipped
with liquid ring compressor to increase the pressure as necessary to deliver the gas to the LLP flare
header (and to raw gas compressor unit in the future) and the relevant discharge line up to the delivery
point;
e) Extension/expansion of Utility Systems.