WORLDWIDE EPC SOLUTIONS FOR OIL & GAS SINCE 1962

BNGL pipeline installation works

BNGL pipeline installation works
_("Mappa

Project information

FEED GAS LINE DN 30” X52 sp. 11.91 e 14.27 mm lunghezza 13.909 m

GAS EXPORT LINE DN 30” X60 sp. 11.13 e 11.91 mm lunghezza 10.996 m (Nr. 1 HDD)

BROADCUT LINE DN 20” X60 sp. 8.74 e 9.53 mm lunghezza 79.125 m


CLIENT

BGC (Iraq)

LOCATION

North Rumaila (NU) and Khur Al Zubair (KAZ), Iraq

DN

20” / 30”

LENGTH

104 Km

START OF WORK

2019

END OF WORK

2020