Project information
Pipeline construction 56” – approx.128.8 Km (Two strings running in parallel)
4 BVSs
2 HDDs (Havel-Oder-Wasserstrasse river – String 1&2)
Pipeline construction 56” – approx.128.8 Km (Two strings running in parallel)
4 BVSs
2 HDDs (Havel-Oder-Wasserstrasse river – String 1&2)