WORLDWIDE EPC SOLUTIONS FOR OIL & GAS SINCE 1962

Oil Gathering network installation

Oil Gathering network installation
_("Mappa

Informazioni sul progetto

Mobilisation and Demobilisation

No. 2 Oil Remote Manifold Area #900 Type C;
No. 2 Trap #900 installation in existing facilities;
130 km Installation of Buried Oil Flowline 6” or 8” x 900#;
14 km Installation of Buried Oil Trunkline 20" x 900#;
No. 43 Crossings Thrust Boring with Casing Pipe or Concrete Bank

Oil Gathering Network Sow:

Oil Well fluids are collected from newly drilled oil wells, by individual 8” & 6” Flowlines.
The Flowline s are then connected either to manifolds located in existing or new plants or new plants or located remotely (so called remote manifold)
Remote Manifolds are connected by 20” Trunk-lines to the new and existing DGS’s.

The DGS’s interested by the Oil gathering works are:

  • Hammar Mishrif existing DGS;
  • Hammar Mishrif New DGS (DGS north);
  • Hammar existing DGS
  • Zubair Mishrif existing DGS
  • Rafidiya existing DGS;
  • IPF’s hammar, Rafidiya and Zubair.

 

The WORK to be performed by the CONTRACTOR consists of buti s not limited to:

  • Installation of scaper traps 900# inside existing facilities;
  • Interconnection of the above said traps to the existing oil treatment facilities by means of cold tie ins or hot tapping tie ins;
  • Installation of Remote manifold Area 900@# (complete of scraper traps, manifolds, Close drain, LER, etc.)
  • Installation of oil trunk-lines (2 x size 20”) for delivery the oil at different level of pressure from Remote Manifold to existing Facilities
  • Installation of oil flowlines, 6” & 8” 900#.
  • Connection of the flowline to manifolds (piping tie-in)

OPTIONAL SoW

  • Pipelines preservation with N2
  • Installation of manifolds inside existing facilities
  • Interconnection of the above presented Manifolds to the existing oil treatment facilities inside DGS by means of cold tie ins or hot tapping tie ins
  • FOC & ELE cable laying in dedicated Trech
  • Hot Tapping
  • LER Supply
  • Installation of oil Trunk-line/ flowlines 1500#
  • Installation of Remote Manifold Area 1500# (complete of scraper traps, manifolds, Close drain, LER, etc.)
  • Installation of scraper traps 1500# inside existing facilities;

The WORK includes all Project Management, Detail Engineering, Procurement of balance of materials (also referred to as GOODS), Construction, Pre-Commissioning and Commissioning activities and start-up.


CLIENT

ENI IRAQ (Iraq)

LOCATION

Zubair Oil Field, Iraq

LENGTH

144 Km

DN

6“/8“/20“

START OF WORK

2019

END OF WORK

2021