WORLDWIDE EPC SOLUTIONS FOR OIL & GAS SINCE 1962

Karachaganak Processing Complex (KPC) Gas Debottlenecking (KGCBN) Project

Karachaganak Processing Complex (KPC) Gas Debottlenecking (KGCBN) Project
Mappa del progetto

Informazioni sul progetto

Main facilities to be installed in the KPC plant and in the field are:

 

- Two (2) x 9.5 MMSm3/d TEG dehydration  & TEG DrizorM regeneration capacity;

 

- Four (4) x 6.5 MMSm3/d JT MP HCDP capacity (2 for eaeh gas dehydration train);

- Gas/Gas heat exchanger to dose LP gas by-pass system;

 

- Hard connections to the existing utilities and any required upgrade to existing facilities;

- Electrical Substation  l Process lnterface Building (PIB) No.9 (to accommodate both E&l equipment);

- Upgrade to existing KPC electrical system;

 

-Incrementai upgrades to DCS,ESD, F&G (ICSS node) systems, dedicated to KGDBN, but installed as extensions of existing systems & houses within the Process lnterface  Building 9 (PIB 9) at KPC;

- Main and secondary Pipe Rack (to connect the new process areato the existing pian).

- lnstallation of a 10.8KM 26" pipeline connecting the export gas from KPC to

Tie-in 108 location  (includes 2 BVS and 36" manifold, flare at t he Tie-in 108 area)


CLIENT

KPO (Kazakhstan)

LOCATION

Aksai, Kazakhstan

START OF WORK

2018

END OF WORK

2020