Works Executed in the last 10 years

N.ClientDescription of worksLenght KmDN "Year
1 Agip Kazakhstan North Caspian Operating Company N.V.
(Kazakhstan)
Kashagan Experimental Programme Project.Construction of the Underground Piping System in the Gas, Sulphur and Slug Catcher Areas of the Main Plant.
(JV with Isker)
PLANT WORKSN/A 2007
2011
2 Eni Congo S.A.
(Congo)
Procurement, Construction & Installation activities with optional Engineering within M'Boundi Oil Centre related to the phase 1 of Gas Valorisation Project & EPC for the New Gathering Network and its connections at the 10" pipeline related to phase 2PLANT & PIPELINE WORKS8" 10"2009
2011
3 Eni Congo S.A.
(Congo)
Engineering, Procurement and Construction (EPC) to link water wells and water treatment section in MboundiN/AN/A2009
2011
4 ENERGIA OCCIDENTE DE MEXICO S. de R.L. de C.V.
(Mexico)
Manzanillo - Guadalajara Gas Pipeline.
(GDI SICIM Pipelines S.A. de C.V.)
30630" 24"2010
2011
5 Snam Rete Gas S.p.A.
(Italy)
Construction of "Martirano - Morano" gas pipeline.
Sections: "Rende - Tarsia" & "Tarsia - Morano"
75 48" 2008
2010
6BORD GAIS EIREANN
(Ireland)
Construction of Curraleigh West to Midleton Gas Pipeline
(SICIM ROADBRIDGE LTD)
47.424"2009
7 Zueitina Oil Company
(Libya)
Dahab Field Development Phase 1.
Installation of Oil and Water Flowlines.
30 4" 8" 10" 2008
2010
8Enagás S.A.
(Spain)
Gasoducto Lorca - Chinchilla Tr2 (Nord)
Contrato Marco.
(J.V. con COPISA Industrial)
93.342"2008
2009
9Enagás S.A.
(Spain)
Gasoducto Ramal a Castellon
Contrato Marco.
(J.V. con COPISA Industrial)
15.316"2008
2009
10 Shell E&P Ireland Limited
(Ireland)
Corrib Project Onshore Gas Terminal CMC. Provision of Welding, Installation and Inspection to D-1002 Slug Catcher.N/A12" 24" 42" 2008
2009
11 Enagás S.A.
(Spain)
Gasoducto Arbos - Barcelona Tr2 - Subtramos 1+2.
Contrato Marco.
(J.V. with COPISA Industrial)
5.836"2008
12 Gaz de France
(France)
Artère du Nord Est, Lot 1 "Petit Tenquin-Cerville" et "Erching-Obergailbach" Gas Pipeline.
(JV with SPAC)
59 36" 2008
13 Enagás S.A.
(Spain)
Construction of BVV Gaspipeline. Section Arbos-Planta de Barcelona.
(JV with Copisa, G&O and Streicher - Sicim share 25%)
7236"2007
2008
14 TOTAL Infrastructures Gaz de France - TIGF
(France)
Artère de Guyenne. Construction d'une Canalisation de Captieux Est à Mouliets-et-Villemartin.
(JV with Spac - Sicim share 50%)
69.436"2007
2008
15 Snam Rete Gas S.p.A.
(Italy)
Construction of Martirano Morano Gas Pipeline.
Section Martirano-Rende.
36.3 48" 2007
2008
16 TENGIZCHEVROIL
(TCO)
(Kazakhstan)
Contract OK201143 - Associated Crude Project & Contract OK200904 - Crude Tank Farm Project. Firewater Area. Installation of Equipment (pumps, monitors), Structural Steelwork, Piping Supports, Piping. plant works N/A 2007
2008
17 TENGIZCHEVROIL
(TCO)
(Kazakhstan)
Contract TCO OM200583 &: TCO 598947: Pipeline Installation and Repairs, Facilities Engineering.
Contract TCO OM201266: Mechanical & Civil Works for 2007-2008 Flip remaining Flowline Replacements.
256" 10" 2006
2008
18Parsons Fluor Daniel International LLC (PFD)
(Kazakhstan)
Contract 01962 - SGP Sulphur Plant.
Various Construction Services.
Plant WorksN/A 2006
2008
19Parsons Fluor Daniel International LLC (PFD)
(Kazakhstan)
Contract 01960 - SGP Sulphur Plant.
Various Construction Services.
Plant worksN/A 2006
2008
20Enagás S.A.
(Spain)
Gasoducto: Falces - Irurzun.5814" 2006
2008
21Snam Rete Gas S.p.A. (Italy)Gas Pipeline Camisano Vicentino-Zimella
(JV: SICIM-GHIZZONI-ICOP)
42.256" 2005
2006
22BORD GAIS EIREANN
(Ireland)
Mayo to Galway Gas Pipeline - Bellanaboy to Ballymoneen.
(SICIM ROADBRIDGE LTD)
13226"2005
2006
23BORD GAIS EIREANN
(Ireland)
South / North Pipeline & Associated Infrastructure.
Lot A: Gormanston to Newry.
(SICIM ROADBRIDGE LTD)
81 18" 2005
2006
24Snam Rete Gas S.p.A.(Italy)Gas Pipeline Vastogirardi - Sulmona.5048"2004
2006
25Parsons Fluor Daniel International LLC (PFD)
(Kazakhstan)
SGI Stage 1, SGI Stage 2, Korolev, Tengiz Trunklines and West Ringmain 1 Pipelines of the SGP Next Generation Gathering System (NGGS). 97 2" 3" 6" 8" 12" 16" 18" 24" 2005
2006
26Snam Rete Gas S.p.A. (Italy)Gas Pipeline Palmi-Martirano.
Section Palmi - Rosarno and Maida- Martirano
(JV with Cambareri Giuseppe & C. S.p.A.)
47 48" 2004
2006
27TOTAL FINA ELF
(Libya)
Great Mabruk Pipeline - EPSCC1.
Installation of Trunklines, Flowlines, Export Pipelines and Power Cables.
59 4" 6" 8" 10" 2004
2005
28Parsons Fluor Daniel International LLC (PFD)
(Kazakhstan)
Gas Export Expansion Project for Tengizchevroil.
Gas Pipeline from Tengiz Camp to Kulsary Scraper Receiving Facility.
Construction and Commissioning of Gas Pipeline.
(JV with Bonatti)
121 40" 2003
2005
29Agip Kazakhstan North Caspian Operating Company N.V.
(Kazakhstan)
Plant Site Preparation and Piling Installation - Early Works, Experimental Programme, Kashagan East Field Development, Kazakhstan.
(IGS SICIM LLC J.V.)
Civil
Works
N/A 2003
2005
30Agip Kazakhstan North Caspian Operating Company N.V.
(Kazakhstan)
Early Works Fuel Gas & Water Pipeline Phase 1A & 1B , Experimental Programme, Kashagan East Field Development, Kazakhstan. Civil Works.
(JV with Bonatti)
51.212" 16" 2003
2005
31Agip Kazakhstan North Caspian Operating Company N.V.
(Kazakhstan)
Camp Utilities - Early Works, Experimental Programme, Kashagan East Field Development, Kazakhstan. Plant Works.
(JV with Bonatti)
Plant
Works
Various 2003
2005
32Gaz du Sud Ouest
(France)
EUSKADOUR Project
Construction of the Biriatou-Arcangues Gas Pipeline
24 24" 2004
2005
33EUPEC
(France)
Total Forvie Mer du Nord, Welding Works, Double Joint3215" 17"2005
34Snam Rete Gas S.p.A.
(Italy)
Gasline PONTREMOLI - PARMA
Pipeline installation accross the Appennini Mountains (North of Italy) including execution of approximately 200 m of tunnel with Raise Boring tecnologies
15.5 30" 2003
2004
35BORD GAIS EIREANN
(Ireland)
Gas Pipeline to Galway City.
Lot 1: Cappagh South to Ballymoneen Pipeline
Lot 2: Ballymoneen to Ballygarraun Pipeline(SICIM ROADBRIDGE LTD)
30 12" 26" 2004
36Karachaganak Petroleum Operating BV
(NL)
Provision of Telemetry System for Gas and Condensate Export Pipelines
(IGS-SICIM LLC J.V.)
Upgrading Works Various 2003
2004
37 Enagás S.A.
(Spain)
Gas Pipeline Santa Cruz de Mudela-Salida a Cuenca.
(JV with COPISA Industrial)
159 32" 2003
2004
38 Karachaganak Petroleum Operating BV
(NL)
Infield Pipelines - Package A (In association with IGS) 36 6" 10" 14" 20" 2002
2003
39Karachaganak Petroleum Operating BV
(NL)
Water Project Phase II - Industrial Water Pumping Station
Installation, Construction, Commissioning and Test for the Industrial Water Intake & Treatment Facilities.
(IGS-SICIM LLC J.V.)
Plant WorksN/A 2002
2003
40Gaz de France
(France)
Construction of Gas Pipeline Sections:
Meslin - Ploufragan and Durrenentzen - Colmar
23.1 10" 12" 2003
41TENP Essen
(Germany)
Gas Pipeline - Section 4 Bahlingen-Tiengen (40")
and Section 5 Husingen-Wallbach (36")
(JV with LUDWIG FREYTAG)
32.2 40" 36" 2002
42Gaz de France
(France)
Gas Pipeline Artère de Guyenne au Sud de Roussines.
Sections: Roussines-Exideuil.
87.532"2002
43Snam Rete Gas S.p.A.
(Italy)
Gasline Pontremoli - Parma.
Pipeline installation accross the Appennini Mountains (North of Italy) including execution of approximately 3,9 Km tunnels having up to 2,7 m diameter.
39 30" 2001
2002
44BORD GAIS EIREANN
(Ireland)
Gas Pipeline to the West, Section 1 & 6
Construction of the Gas Pipeline Sections:
Dublin - Westmeath (30") and Gormanston - Ballough (36")
(SICIM ROADBRIDGE LTD)
14030" 36"2001
2002
45Karachaganak Petroleum Operating BV
(NL)
Gasline Udoman River - UNIT 3. EPC Contract
Engineering, Procurement, Construction and Commissioning of Gas Pipeline and Metering Station
(IGS SICIM)
20 14" 2001
2002
46Karachaganak Petroleum Operating BV
(NL)
Karachaganak Development Project - Kazakhstan.
Civil, Mechanical, Electrical and Instrumental works for UNIT 3. Rehabilitation Works Project.
(IGS-SICIM LLC J.V.)
Plant Works Various 1999
2001
47Gaz de France
(France)
Gazline Artère des marches du Nord-Est Avenant au Lot 1 DN 1000
Section: Tannay - Morelmaison
39 40" 2001
2002
48Gaz de France
(France)
Gazline Artère des marches du Nord-Est
Section: Abbaye - Tannay - Erize la Petite
(JV with SPAC)
115 40" 2001
2002
49Gaz de France
(France)
Gazline Artère des marches du Nord-Est et Artère du Centre
Section: Tannay - Morelmaison (JV with SPAC)
92.4 40" 2001
2002
50SNAM S.p.A.
(Italy)
Gasline Flaibano-Pordenone.
Pipeline installation in presence of high water table; crossing of Tagliamento River.
25 48" 2001
51 Karachaganak Petroleum Operating BV
(NL)
Lifting of a Water Reservoir.
Engineering, Procurement and Costruction of an elevated 2000 cubic meter Tank (at +38 m.a.s.l.)
(IGS-SICIM LLC J.V.)
Civil Works N/A 2001
52Karachaganak Petroleum Operating BV
(NL)
Karachaganak Development Project - Kazakhstan.
Civil, Structural and Mechanical Installation Works at UNIT 2.
Site preparation, foundation and grading works, installation of piperack, equipment and machineries.
(IGS-SICIM LLC J.V.)
Plant
Works
Various1999
2001
53Enagás S.A.
(Spain)
Construction work relevant to: Gas Pipeline Villamañan - Astorga - Ponferrada
(JV with COPISA Industrial)
83 16" 2001
54TRANSITGAS AG
(Switzerland)
TRG3 Pipeline:Rodesdorf-Lostorf. Construction work relevant to: LOT 1 Rodesdorf - Seewen and LOT 2 Seewen-Lostorf (JV with local partner) 55 36" 2000
2001
55TRANSITGAS AG
(Switzerland)
TRG2 Pipeline: Rothorn Sud - Grimsel Nord. With the exclusion of Urwied tunnel.
(JV with local partner)
27 48" 2000
2001
56(ADCO)Abu Dhabi Company for Onshore Oil Operations
(U.A.E.)
MOL System Modification - Contract No. 5288/EC 20345.Replacement of approximately 60 sections of oil pipeline, DN 24", 32", 36", total length 11 km, including installation of miscellaneous station works, decommissioning of existing line, precommissioning and commissioning of 300 km of pipelines. (J.V. with local partner) 11 24" 32" 36" 2000
2001
57Gaz de France
(France)
Gasline "Artère des marches du Nord-Est et Artère du Centre"
Section: Selles - Saulnot
(J.V. with SPAC)
72 36" 2000
58Gaz de France
(France)
Gasline:" Artère du Centre"
Section: Chemery - Roussines
(J.V. with SPAC)
110 32" 2000
2001
59 Gaz de France
(France)
Gasline: "Canalisation de transport Gaz Naturel"
Section: Monosque-Entrecasteaux
(J.V. with SPAC)
59.416"2000
60 Karachaganak Petroleum Operating BV
(NL)
Karachaganak Development Project - Kazakhstan.
Interconnecting Pipelines - Civil and Mechanical works for construction of gasline and water line with ancillaries facilities.
(IGS-SICIM LLC J.V.)
36 10" 14" 16" 1999
2001