ClientDescription of worksLenght (km)DNPeriod
AgipKCO (KAZAKHSTAN)Kashagan Field Development Experimental Programme Building of Temporary Construction Area located next to Shoreline at KP 65+500N/AN/A2014 2015
ENI CONGO (CONGO)Additional work for the Revamping of Platforms DP4 DP5.N/AN/A2013 2015
SNPC (CONGO)Installation de surface (EPCI). (J.V. with RENCO)N/AN/A2013 2015
ENI IRAQ (IRAQ)EPC Pipelines Installation. Zubair Oil Field Project. (J.V. with Drake & Scull International)N/AN/A2012 2015
ENI CONGO (CONGO)Revamping of the structure and safety system of the Offshore Platforms DP4 and DP5 - Offshore Platform of Loango (Republic of Congo). (J.V. with RENCO)N/AN/A2011 2015
ENI CONGO (CONGO)Revamping of Eni Congo Headquarter.N/AN/A2012 2015
PETROMAR (ANGOLA)Mafumeira-4 - Pipeline Installation-Mechanical & Painting Works.118"2013 2015
WORLEY PARSONS (UNITED KINGDOM)Agip KCO Eskene West Rail Project. Supply of Painted Prefabricated Steel for Gondola Shed Covers.N/AN/A2014
PETROMAR (ANGOLA)Fabrication and Transportation of Skid Materials for EPCI-4 Project.N/A2"/20"2014 2015
COTCO (CAMEROON)New Shippers Crude Oil Topping Plant Modifications.N/AN/A2014 2015
ENI CONGO (CONGO)Design, Supply and Installation of a new oil of drainage tank on DP6 Platform of Loango Field, including complementary activities.N/AN/A2011 2015
ENI CONGO (CONGO)Well connection and water injection in the Oil Fields of M'Boundi, Kouakouala and Loufika. (J.V. with RENCO)N/AN/A2011 2013
ENI CONGO (CONGO)Multidisciplinary Activities on PW1 M'Boundi FieldN/AN/A2013 2014
AgipKCO (KAZAKHSTAN)Mechanical Maintenance and Preservation Works for Start Up and post Start-Up ActivitiesN/AN/A2013 2014
AgipKCO (KAZAKHSTAN)Kashagan Field Development Experimental Programme. Mechanical Works for OPF Completion.N/AN/A2013 2014
ENI CONGO (CONGO)EPCI for the upgrading of an existing 16” Sealine and increase of the Pump Station flow rate at Cote Madeve. (JV with Renco)N/A16"2012 2014
ENI CONGO (CONGO)Service of Global Maintenance for the Onshore Platforms and the Oil Centre of Eni Congo. (J.V. with RENCO)N/AN/A2012 2014
TCO (KAZAKHSTAN)Master Contract No. 883274 Construction Services - FlowlinesN/AN/A2008 2013
ENI CONGO (CONGO)EPCI Activities within M’Boundi Field Development Project. (JV with Renco)LAVORI D'IMPIANTO E RETI DI RACCOLTA4"/8"/12"/16"2009 2013
ABB S.p.A (CONGO)P20030 - PW1 M'Boundi. Additional manpower for PW1 Project. PWHT on ABB piping.N/AN/A2012 2013
TERASCOM (CONGO)EPC of an 8” Pipeline for the connection of HP Wells at Cluster 500 Bis in M’Boundi Field.--8"2011 2014
ALLSEAS UK (UNITED KINGDOM)Laggan - Tormore Development Installation of Pipelines & Umbilicals (SICIM ROADBRIDGE LTD)1230” /18"/8"/2"2011 2013
COTCO (CAMEROON)Lom Pangar Pipeline Modification Project.26,630"2012 2014
Transportadora de Gas Natural de la Huasteca, S. de R.L. de C.V. (MEXICO)TAMAZUNCHALE Gas Pipeline23336"/30"2012 2014
TARAHUMARA PIPELINE S. de R.L. de C.V. (MEXICO)Chihuahua Natural Gas Transmission Pipeline. (GDI-SICIM PIPELINES S.A. DE C.V.)38136"2012 2013
Fives Nordon (FRANCE)Projet GIRLAND EPC Lussagnet2,4various2012 2013
ECOPETROL (COLOMBIA)Construction of the Gas Pipeline Cupiagua-Cusiana.40,218"/20"2011 2013
TIGF (FRANCE)EPC of the Pipeline Artère du Bearn Projet (EPC Ligne). Lot: Lacq-Lussagnet.5732"2011 2012
TIGF (FRANCE)Projet GIRLAND EPC Ligne.5736"2012 2013
PLUSPETROL (ANGOLA)Construction of the Castanha - Malongo Pipeline EPC. (SICIM S.p.A. - Kalunga Freedom Oil JV)356"/8"/10"2012 2014
OBC (COLOMBIA)Contract for Construction, Testing, Commissioning & Start up of the "Oleoducto Bicentenario de Colombia" Phase 1 Section Araguaney – Banadia.23042"2011 2014
BGE (IRELAND)Pipeline to Great Island Power Station, Co. Wexford4616"2012 2013
Consorcio Granja y Montero - Conciviles (PERU)ConstrucciĂłn de las Redes Troncales Sur del Sistema de DistribuciĂłn de Gas Natural de Ica.16020"2012 2014
OCENSA (COLOMBIA)EPC for River San Jorge Crossing (24") by Horizontal Directional Drilling system1,324"2013 2014
CH2M Hill (MEXICO)Front End Engineering Design (FEED) Frontera – Aguascalientes Natural Gas Transportation System. (GDI SICIM Pipelines S.A. de C.V.)95430"/36"2011 2012
TGI (COLOMBIA)Cusiana Project - Lot 2 Construction of a loop of 54km ND 20" between EI Porvenir (Monterrey Municipality, Casanare) and Miraflores (Miraflores Municipality, BoyacĂĄ). (CONSORCIO EL PORVENIR - MIRAFLORES)57,220"2011 2013
ENAGÁS (SPAIN)Gasoducto Martorell - Figueras Tramo 1. (UTE Martorell Gas)84,636"2010 2013
BATEMAN (KAZAKHSTAN)Kashagan Field Development Experimental Program. Power Generation & Utility Plant. Mechanical Works.N/AN/A2008 2012
ENAGÁS (SPAIN)Gasoducto Tivissa – Paterna Tr3 (Sud). Contrato Marco. (UTE SAGUNTO)64,640"/32"2011 2012
WINGAS (GERMANY)Fernleitung OPAL von Lubmin nach Olbernhau, DN 1400. Lots 11, 12, 13 and 14 (Grossmar - Olbernhau). (J.V. with Max Streicher GmbH)136,556"2009 2011
ENI CONGO (CONGO)EPC of the Pipeline for the Development of Zingali Oil Field and related wells connections, electrical and instrumentation activities on Zingali platform.66"2010 2011
AgipKCO (KAZAKHSTAN)Kashagan Experimental Programme Project. Construction of the Underground Piping System in the Gas, Sulphur and Slug Catcher Areas of the Main Plant. (J.V. with ISKER)LAVORI D'IMPIANTON/A2007 2011
Eni Congo S.A. (CONGO)Procurement, Construction and Installation Activities with optional Engineering within M’Boundi Oil Centre related to the phase 1 of Gas Valorisation Project & EPC for the New Gas Gathering Network and its connections at the 10" pipeline related to phase 2.LAVORI D'IMPIANTO E RETI DI RACCOLTA8"/10"2009 2011
Eni Congo S.A. (CONGO)Engineering, Procurement and Construction (EPC) to link water wells and water treatment section in M'Boundi.N/AN/A2009 2011
ENERGIA OCCIDENTE DE MEXICO (MEXICO)Manzanillo - Guadalajara Gas Pipeline. (GDI SICIM Pipelines S.A. de C.V.)30630"/24"2010 2011
Snam Rete Gas S.p.A. (ITALY)Construction of Martirano-Morano Calabro Pipeline. Sections: Rende-Tarsia & Tarsia-Morano Calabro.7548"2008 2010
BORD GAIS EIREANN (IRELAND)Construction of Curraleigh West to Midleton Gas Pipeline. (SICIM ROADBRIDGE LTD)47,424"2009
Zueitina Oil Company (LIBYAN ARAB JAMAHIRIYA)Dahab Field Development Phase 1. Installation of Oil and Water Flowlines.304"/8"/10"2008 2009
EnagĂĄs S.A. (SPAIN)Gasoducto Lorca - Chinchilla Tr2 (Nord). Contrato Marco. (J.V. with COPISA Industrial)93,342"2008 2009
EnagĂĄs S.A. (SPAIN)Gasoducto Ramal a Castellon. Contrato Marco. (J.V. with COPISA Industrial)15,316"2008 2009
Shell E&P Ireland Limited (IRELAND)Corrib Project Onshore Gas Terminal CMC. Provision of Welding, Installation and Inspection to D-1002 Slug Catcher.N/A12"/24"/42"2008 2009
Enagás S.A. (SPAIN)Gasoducto Arbos - Barcelona Tr2 – Subtramos 1+2. Contrato Marco. (J.V. with COPISA Industrial)5,836"2008
Gaz de France (FRANCE)Artère du Nord Est, Lot 1 "Petit Tenquin-Cerville" et "Erching-Obergailbach" Gas Pipeline. (JV with SPAC)5936"2008
EnagĂĄs S.A. (SPAIN)Construction of BVV Gaspipeline. Section Arbos-Planta de Barcelona. (J.V. with COPISA-G&O-STREICHER - Sicim share 25%)7236"2007 2008
TIGF (FRANCE)Artère de Guyenne. Construction d'une Canalisation de Captieux Est à Mouliets-et-Villemartin. (J.V. with SPAC - Sicim share 50%)69,436"2007 2008
Snam Rete Gas S.p.A. (ITALY)Construction of Martirano Morano Gas Pipeline. Section Martirano-Rende.36,348"2007 2008
TCO (KAZAKHSTAN)Contract OK201143 - Associated Crude Project & Contract OK200904 - Crude Tank Farm Project. Firewater Area. Installation of Equipment (pumps, monitors), Structural Steelwork, Piping Supports, Piping.IMPIANTIN/A2007 2008
TCO (KAZAKHSTAN)Contract TCO OM200583 & TCO 598947: Pipeline Installation and Repairs, Facilities Engineering. Contract TCO OM201266: Mechanical & Civil Works for 2007-2008 Flip remaining Flowline Replacements.256"/10"2006 2008
Parsons Fluor Daniel International LLC (PFD) (KAZAKHSTAN)Contract 01962 - SGP Sulphur Plant. Various Construction Services.IMPIANTIN/A2006 2008
Parsons Fluor Daniel International LLC (PFD) (KAZAKHSTAN)Contract 01960: SGP Sulphur Plant. Construction Services.IMPIANTIN/A2006 2007
EnagĂĄs S.A. (SPAIN)Gasoducto: Falces - Irurzun.5814"2006 2008
BORD GAIS EIREANN (IRELAND)South / North Pipeline & Associated Infrastructure. Lot A: Gormanston to Newry. (SICIM ROADBRIDGE LTD)8118"2005 2006
BORD GAIS EIREANN (IRELAND)Mayo to Galway Gas Pipeline - Bellanaboy to Ballymoneen. (SICIM ROADBRIDGE LTD)13226"2005 2006
Snam Rete Gas S.p.A. (ITALY)Gas Pipeline Camisano Vicentino-Zimella (J.V. SICIM-GHIZZONI-ICOP) 42,256"2005 2006
Snam Rete Gas S.p.A. (ITALY)Gas Pipeline Vastogirardi - Sulmona. 5048"2004 2006
Parsons Fluor Daniel International LLC (PFD) (KAZAKHSTAN)SGI Stage 1, SGI Stage 2, Korolev, Tengiz Trunklines and West Ringmain 1 Pipelines of the SGP Next Generation Gathering System (NGGS).972"/3"/6"/8"/12"/16"/18"/24"2005 2006
Snam Rete Gas S.p.A. (ITALY)Gas Pipeline Palmi-Martirano. Section Palmi - Rosarno and Maida- Martirano (J.V. with Cambareri Giuseppe & C. S.p.A.)4748"2004 2006
TOTAL FINA ELF (LIBYAN ARAB JAMAHIRIYA)Great Mabruk Pipeline - EPSCC1. Installation of Trunklines, Flowlines, Export Pipelines and Power Cables.594"/6"/8"/10"2004 2005
Parsons Fluor Daniel International LLC (PFD) (KAZAKHSTAN)Gas Export Expansion Project for Tengizchevroil. Gas Pipeline from Tengiz Camp to Kulsary Scraper Receiving Facility. Construction and Commissioning of Gas Pipeline. (J.V. with Bonatti)12140"2003 2005
Gaz du Sud Ouest (FRANCE)EUSKADOUR Project Construction of the Biriatou-Arcangues Gas Pipeline2424"2004 2005
Agip Kazakhstan North Caspian Operating Company N.V. (KAZAKHSTAN)Plant Site Preparation and Piling Installation - Early Works, Experimental Programme, Kashagan East Field Development, Kazakhstan. (IGS-SICIM LLC J.V.)LAVORI CIVILIN/A2003 2005
Agip Kazakhstan North Caspian Operating Company N.V. (KAZAKHSTAN)Early Works Fuel Gas & Water Pipeline Phase 1A & 1B , Experimental Programme, Kashagan East Field Development, Kazakhstan. Civil Works. (J.V. with Bonatti)51,212"/16"2003 2005
Agip Kazakhstan North Caspian Operating Company N.V. (KAZAKHSTAN)Camp Utilities - Early Works, Experimental Programme, Kashagan East Field Development, Kazakhstan. Plant Works. (J.V. with Bonatti)IMPIANTIVARI2003 2005
EUPEC (FRANCE)Total Forvie Mer du Nord, Welding Works, Double Joint.3215"/17"2005
Snam Rete Gas S.p.A. (ITALY)Gasline Pontremoli - Parma. Pipeline installation accross the Appennini Mountains (North of Italy) including execution of approximately 200 m of tunnel with Raise Boring tecnologies15,530"2003 2004
EnagĂĄs S.A. (SPAIN)Gas Pipeline Santa Cruz de Mudela-Salida a Cuenca. (J.V. with COPISA Industrial)15932"2003 2004
Karachaganak Petroleum Operating BV (NETHERLANDS)Provision of Telemetry System for Gas and Condensate Export Pipelines (IGS-SICIM LLC J.V.)-VARI2003 2004
BORD GAIS EIREANN (IRELAND)Gas Pipeline to Galway City. Lot 1: Cappagh South to Ballymoneen Pipeline Lot 2: Ballymoneen to Ballygarraun Pipeline (SICIM ROADBRIDGE LTD)3012"/26"2004
Gaz de France (FRANCE)Construction of Gas Pipeline Sections: Meslin - Ploufragan and Durrenentzen - Colmar23,110"/12"2003
Karachaganak Petroleum Operating BV (NETHERLANDS)Infield Pipelines - Package A (IGS-SICIM LLC J.V.)366"/10"/14"/20"2002 2003
Karachaganak Petroleum Operating BV (NETHERLANDS)Water Project Phase II - Industrial Water Pumping Station Installation, Construction, Commissioning and Test for the Industrial Water Intake & Treatment Facilities. (IGS-SICIM LLC J.V.)IMPIANTIN/A2002 2003
TENP Essen (GERMANY)Gas Pipeline - Section 4 Bahlingen-Tiengen (40") and Section 5 Husingen-Wallbach (36") (J.V. with LUDWIG FREYTAG)32,236"/40"2002
Gaz de France (FRANCE)Gas Pipeline Artère de Guyenne au Sud de Roussines. Sections: Roussines-Exideuil.87,532"2002
BORD GAIS EIREANN (IRELAND)Gas Pipeline to the West, Section 1 & 6. Construction of the Gas Pipeline Sections: Dublin - Westmeath (30") and Gormanston - Ballough (36"). (SICIM ROADBRIDGE LTD)14030"/36"2001 2002
Snam Rete Gas S.p.A. (ITALY)Gasline Pontremoli - Parma. Pipeline installation accross the Appennini Mountains (North of Italy) including execution of approximately 3,9 Km tunnels having up to 2,7 m diameter.3930"2001 2002
Karachaganak Petroleum Operating BV (NETHERLANDS)Gasline Udoman River - UNIT 3. EPC Contract Engineering, Procurement, Construction and Commissioning of Gas Pipeline and Metering Station (IGS-SICIM LLC J.V.)2014"2001 2002
Karachaganak Petroleum Operating BV (NETHERLANDS)Karachaganak Development Project - Kazakhstan. Civil, Mechanical, Electrical and Instrumentation works for UNIT 3. Rehabilitation Works Project. (IGS-SICIM LLC J.V.)IMPIANTIVARI1999 2001
Gaz de France (FRANCE)Gazline Artère des marches du Nord-Est Avenant au Lot 1 DN 1000. Section: Tannay - Morelmaison.3940"2001 2002
Gaz de France (FRANCE)Gazline Artère des marches du Nord-Est. Section: Abbaye - Tannay - Erize la Petite. (J.V. with SPAC)11540"2001 2002
Gaz de France (FRANCE)Gazline Artère des marches du Nord-Est et Artère du Centre. Section: Tannay - Morelmaison. (J.V. with SPAC)92,440"2001 2002
SNAM S.p.A. (ITALY)Gasline Flaibano-Pordenone. Pipeline installation in presence of high water table; crossing of Tagliamento River.2548"2001
Karachaganak Petroleum Operating BV (NETHERLANDS)Lifting of a Water Reservoir. Engineering, Procurement and Costruction of an elevated 2000 cubic meter Tank (at +38 m.a.s.l.). (IGS-SICIM LLC J.V.)LAVORI CIVILIN/A2001
Karachaganak Petroleum Operating BV (NETHERLANDS)Karachaganak Development Project - Kazakhstan. Civil, Structural and Mechanical Installation Works at UNIT 2. Site preparation, foundation and grading works, installation of piperack, equipment and machineries. (IGS-SICIM LLC J.V.)IMPIANTIVARI1999 2001
EnagĂĄs S.A. (SPAIN)Construction work relevant to: Gas Pipeline VillamaĂąan - Astorga - Ponferrada. (J.V. with COPISA Industrial)8316"2001
TRANSITGAS AG (SWITZERLAND)TRG3 Pipeline: Rodesdorf-Lostorf. Construction work relevant to: Lot 1 Rodesdorf-Seewen and Lot 2 Seewen-Lostorf. (J.V. with local partner)5536"2000 2001
TRANSITGAS AG (SWITZERLAND)TRG2 Pipeline: Rothorn Sud - Grimsel Nord. With the exclusion of Urwied tunnel. (J.V. with local partner)2748"2000 2001
(ADCO) Abu Dhabi Company for Onshore Oil Operations (UNITED ARAB EMIRATES)MOL System Modification - Contract No. 5288/EC 20345. Replacement of approximately 60 sections of oil pipeline, DN 24", 32", 36", total length 11 km, including installation of miscellaneous station works, decommissioning of existing line, precommissioning and commissioning of 300 km of pipelines. (J.V. with local partner)1124"/32"/36"2000 2001
Gaz de France (FRANCE)Gasline Artère des marches du Nord-Est et Artère du Centre. Section: Selles - Saulnot. (J.V. with SPAC)7236"2000
Gaz de France (FRANCE)Gasline: Artère du Centre. Section: Chemery - Roussines. (J.V. with SPAC)11032"2000 2001
Gaz de France (FRANCE)Gasline: Canalisation de transport Gaz Naturel. Section: Manosque-Entrecasteaux. (J.V. with SPAC)59,416"2000
Karachaganak Petroleum Operating BV (NETHERLANDS)Karachaganak Development Project - Kazakhstan. Interconnecting Pipelines - Civil and Mechanical works for construction of gasline and water line with ancillaries facilities. (IGS-SICIM LLC J.V.)3610"/14"/16"1999 2001
TRANSITGAS AG (SWITZERLAND)Gasline TRG2 - Daeniken - Griespass. Replacement of the existing pipeline DN 850 with a new pipeline DN 1.200, inside the tunnels Grimsel, Urweid, Rothorn, Gstelli, Unterstoch, Kirchet, Ballemberg including connecting sections. (J.V. with local partner)45,548"1999
Karachaganak Petroleum Operating BV (NETHERLANDS)Karachaganak Development Project - Kazakhstan. Civil and Mechanical works for UNIT 3 - Condensate Pump Installation Project. (IGS-SICIM LLC J.V.)PLANT WORKSVARIOUS1998 1999
Karachaganak Petroleum Operating BV (NETHERLANDS)Karachaganak Development Project - Kazakhstan. Civil and mechanical works relevant to the installation of flowlines connecting n° 11 wells to Satellite Stations (phase 1). (IGS-SICIM LLC J.V.)60VARIOUS1999
REPSOL-Enagås (SPAIN)Oil pipeline Cartagena - Puertollano Section 3° and 4°. Mountainous terrain with hard rock. (J.V. with local partner)17822"1999
Gaz de France (FRANCE)Gasline Artère des plateaux du Vexin. Section Cuvilly - Moussy. (J.V. with local partner)8236"1999
TRANSITGAS AG (SWITZERLAND)Construction of two spreads of pipeline TRG2, DN 1200 (48"), between the Grimsel and Gries Tunnels. (J.V. with local partner)5,648"1997 1999
TRANSITGAS AG (SWITZERLAND)Gasline TRG 2 - Daeniken - Griespass. Replacement, inside Obergesteln tunnel of the existing pipeline DN 850 with the new pipeline DN 1.200. (J.V. with local partner)2,348"1997 1999